|
|
Contact:
|
Stacie Nordhoff
|
|
PreBid Date:
|
07/08/2010
01:00 PM
|
|
PreBid Info:
|
|
|
|
Company:
|
Hagerman Inc. (Fishers)
|
|
Bid Date:
|
07/27/2010
01:00 PM
|
|
Bid Info:
|
|
|
|
| Bid Categories: | Prime Bidder-Bid Item 06-Masonry Prime Bidder-Bid Item 07-General Trades Prime Bidder-Bid Item 08-Roofing Prime Bidder-Bid Item 09-Aluminum Systems, Windows/Glass & Glazing Prime Bidder-Bid Item 10-Metal Studs, Drywall, & Acoustical Ceilings Prime Bidder-Bid Item 11-Ceramic Tile Prime Bidder-Bid Item 12-Carpet & Resilient Flooring Prime Bidder-Bid Item 13-Painting/Wall Covering Prime Bidder-Bid Item 14-Elevator (Included in BI 07-General Trades) Prime Bidder-Bid Item 15-Fire Protection Prime Bidder-Bid Item 16-Mechanical, HVAC Ductwork, Plumbing, & Temperature Controls Prime Bidder-Bid Item 17-Air & Water-Test & Balance Prime Bidder-Bid Item 18-Electrical & Technology Subcontractor/Supplier Plan Room (C) Eastern Engineering Supply Use Only
|
|
|
|
Job Purchase Information:
|
UPON APPROVAL BY HAGERMAN Inc., one complete printed set of bidding documents is available to Prime Bidders for no charge (except shipping when applicable).
Additional sets may be purchased per the options and pricing listed on the Order page {plus Processing Fee and Tax (and Shipping when applicable)}.
Although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping prices (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.
*****ADDENDA ARE NOT INCLUDED IN PURCHASE SET PRICES UNLESS SPECIFICALLY STATED. ADDENDA ARE POSTED FOR DOWNLOADING ON THE INFORMATION AND ADDENDA TABS.*****
|
|
Addenda- 07/14/2010 - Addendum #1 COMPLETE shipped via UPS Ground. Click to View
- 07/20/2010 - Addendum #2 COMPLETE shipped via UPS Ground. Click to View
- 07/22/2010 - Addendum #3 COMPLETE shipped via UPS Ground. Click to View
|
|
|
|
|